Location Highlights

IMPROVEMENTS:

  • Reconstruct the pavement along Oraton Parkway Northbound and Southbound from Central Avenue to Park Street.
  • Replace five traffic signals located at the following intersections: Oraton Parkway NB with Freeway Drive; Oraton Parkway SB with Freeway Drive; Oraton Parkway NB with Williams Street; Oraton Parkway SB with Williams Street; and Oraton Parkway NB with New Street.

CONSTRUCTION:

  • Construction work to be performed in multiple stages between Park Avenue and immediately south of Central Avenue
  • Temporary traffic shifts will be utilized to facilitate the work
  • A temporary exit ramp from southbound Garden State Parkway to southbound North Oraton Parkway will be located south of New Street
  • Temporary detours will be utilized to facilitate the work
  • Temporary pavement repairs will be performed
  • Work to begin on or about July 9, 2018

Location Updates

July 2, 2019

  • A work zone has been established on eastbound Williams Street over the GSP. This work zone will be utilized for new sidewalk construction.
  • During the week of 06/24/19 through 07/01/19, bridge sidewalk and parapet reconstruction will continue on Williams Street at Oraton Parkway. Work will be supported by East Orange Police.
  • During the week of 06/24/19, new roadway lighting installation will continue on Oraton Parkway between Central Avenue and Park Avenue. Work will be supported by East Orange Police.
  • During the weeks of 06/24/19 through 07/15/19, curb and sidewalk replacement will continue on Oraton Parkway northbound, between Winthrop Terrace and Park Avenue. Work will be supported by East Orange Police.

June 28, 2019

  • A work zone has been established on eastbound Williams Street over the GSP. This work zone will be utilized for new sidewalk construction.
  • During the week of 06/24/19 through 07/01/19, bridge sidewalk and parapet reconstruction will continue on Williams Street at Oraton Parkway. Work will be supported by East Orange Police.
  • During the week of 06/24/19, new roadway lighting installation will continue on Oraton Parkway between Central Avenue and Park Avenue. Work will be supported by East Orange Police.
  • During the weeks of 06/24/19 through 07/15/19, curb and sidewalk replacement will continue on Oraton Parkway northbound, between Winthrop Terrace and Park Avenue. Work will be supported by East Orange Police.